Plastics guide
Plastics maintenance, keeping moulds, presses and cooling equipment connected
Use Wular Works to track mould histories, record cycle counts, plan tool-change service and reserve parts for plastics production equipment.
How can Plastics teams use Wular Works?
Plastics manufacturers can use Wular Works to give each mould and press a distinct maintenance history, record cumulative usage and prepare service during tool changes. Link cooling equipment and spare parts to the relevant jobs, then retain the inspection results with the asset that was actually serviced.
Give the tooling its own maintenance identity
A mould may move between presses while the service team still needs its previous repair history. Create an asset record for the mould itself and a separate record for each press. Use categories and equipment codes that the toolroom can recognise. Record the current location as tooling moves through production and maintenance.
Keep the manufacturer information, manuals and relevant tooling documents with the correct record. When a fault report mentions both a press and a mould, the planner should identify which asset the repair concerns. The resulting history becomes more useful than collecting every tool issue under a production-line name.
Record cycle counts with a consistent observation process
At a tool change, the operator or toolroom records the cumulative cycle count against the relevant meter. Preserve the observation time and unit. A service interval can use a cumulative meter when the team has a dependable method for recording those observations.
Review the history before treating the latest reading as the basis for a service decision. A missing reading or a physical counter reset needs explanation. The meter model keeps counters cumulative, so a replacement meter should be used after a reset rather than entering a lower value against the existing counter.
Prepare maintenance before the tool becomes available
Use a saved work-order template for recurring tooling inspections and select the version required by the plan. The planner can coordinate due service with the next agreed tool-change window. Assignment to the toolroom team makes responsibility visible while the press schedule is being finalised.
Review supporting equipment as part of preparation. A chiller service may need a filter kit, and the stores balance should account for other jobs’ reservations. Reserve the required quantity against the order and review an outstanding purchase before committing the visit. This keeps the planned work connected to the parts that will be available.
Use the completed job to improve the next setup
Record the condition found, work completed, parts used and relevant evidence. A note that describes the affected feature or service location helps the next technician interpret a repeat complaint. Retain the completed checklist version so the planner can see which instructions were followed at the time.
For the initial rollout, choose one tooling family and its supporting presses. Review whether the same asset can be followed across moves, whether readings arrive consistently and whether repeat jobs contain usable findings. Expand after the toolroom and production planners agree that the records reflect the actual handoff.
Three workflows to put into practice
Connect the guide to the modules your team will use on the job.
Track a mould across jobs
Give each mould its own asset record. When it moves between presses, its service history and tooling documents stay with the mould.
Explore assetsRecord production cycles
Enter the cumulative cycle count against the tool at changeover. The toolroom can see the latest reading and when it was recorded.
Explore asset metersPrepare chiller maintenance
Before a scheduled chiller service, stores checks the filter balance and reserves the required set for the plastics line.
Explore parts inventoryCommon questions
Should a mould and its press share one asset record?
Separate records let each keep its own service history. Use the job description and location to explain the production setup involved in a repair.
Can maintenance follow cycle counts?
A cumulative meter can record cycles and support usage-based service intervals. The team needs consistent readings and an agreed process for physical counter changes.
How can stores prepare for a chiller service?
Check the available part balance and reserve the filter or kit against the work order. Review deliveries before confirming work dependent on those parts.